Project: 5 Star Resort In Qetaifan Island, Qatar (Year 2021-22)
Main Contractor: Al Jaber Trading And Contracting
Scope 1: Intumescent Fireproofing Of Steel Structures
Product: Steemaster 120 Sb (Jotun)
Scope 2: Cementitious Fireproofing Of Steel Structures
Product: Pyrolite 15 (Carboline)
Scope 3: Firestopping Of Top Of Wall Joint And Mep Penetrations
Product: Hilti Firestop Products
Project: Western Taxiway And Stand Development Works- Hamad International Airport Expansion Project (Year 2021-22)
Main Contractor: Ucc Bahadir Tedeschia Jv (Ubt Jv)
Scope 1: Cementitious Fireproofing Of Steel Structures
Product: Pyrolite 15 (Carboline)
Scope 2: Tunnel Fire Protection Lining
Product: Tecbor Fire Protection Boards (Mercor Tecresa, Spain)
Scope 3: Firestopping Of Top Of Wall Joint And Mep Penetrations
Product: Hilti Firestop Products
Project: Lusail Plaza Towers Qatar (Year 2021-22)
Main Contractor: Hyundai Engneering And Construction
Scope: Firestopping Of Top Of Wall Joint
Product: Tremstop Acrylic (Tremco)
Project: Doha Oasis (Year 2018-20)
Main Contractor: Redco Construction- Almana
Scope: Firestopping Of Top Of Wall Joint And Mep Penetrations
Product: Hilti Firestop Products
Project | Contractor | Start Year | Scope of work (Supply and installation) | |
---|---|---|---|---|
1 | Hamad International Airport Expansion- Western Taxiway and stand development works | UCC-Bahadir and Tedeschia JV (UBT JV) | 2021 | Firestopping (fire sealant) |
2 | Lusail Plaza Towers | Hyundai Engineering & Contracting | 2021 | Firestopping (fire sealant) |
3 | 5-star hotel in Qetaifan Island | Al Jaber Trading & Contracting | 2020 | Firestopping (fire sealant) |
4 | Water Park in Qetaifan Island | Redco Constructions- Almana | 2020 | Firestopping (fire sealant) |
5 | Dukhan Airbase | Advance Construction Technologies | 2020 | Firestopping (fire sealant) |
6 | Marsa Arabia – St.Regis Hotel in Pearl Qatar | Construction Development Company | 2020 | Firestopping (fire sealant) |
7 | Qatar PPP Development Package1 (8 Schools ) | Al Jaber Trading Contracting | 2020 | Firestopping (fire sealant) |
8 | Tenbek Hospital at Al Khor | Al Ali Engineering Co.WLL | 2020 | Firestopping (fire sealant) |
9 | Doha Oasis Mall and Mixed-use development | Redco Constructions- Almana | 2018 | Firestopping (fire sealant) |
10 | Industrial Area sewage treatment works – Phase 3A expansion | Larsen & Toubro Construction | 2020 | Firestopping (fire sealant) |
11 | Marina Mixed 12 Towers | Takyeef Electromechanical | 2019 | Firestopping (fire sealant) |
12 | Mixed use Development at Airport Road | SAMKO International WLL | 2021 | Firestopping (fire sealant) |
13 | German Embassy | Bluu Qatar | 2021 | Firestopping (fire sealant) |
14 | Dukhan Bank Head quarter at Lusail | Golden Bay Trading & Contracting | 2020 | Firestopping (fire sealant) |
15 | Qatara Boutique Hotel | Al Sarh holding | 2019 | Firestopping (fire sealant) |
16 | Falcon 3 Facilities phase 2 | United construction Establishment | 2019 | Firestopping (fire sealant) |
17 | Lusal LRT Project | QDVC | 2016 | Firestopping (fire sealant) |
18 | Redline north Underground | ISG JV | 2017 | Firestopping (fire sealant) |
19 | Al Wakra stadium – Energy Center | Takyeef Electromechanical | 2017 | Firestopping (fire sealant) |
20 | Gold Line Underground (Al Waab, Al Sudan and Sport City Station) | ALYSJ JV | 2017 | Firestopping (fire sealant) |
21 | Expansion of Aspire Academy | Construction Development Company | 2016 | Firestopping (fire sealant) |
22 | Qatar National Museum | BK Gulf | 2016 | Firestopping (fire sealant) |
23 | Msheireb Downtown Doha Phase 1C | Brookfield Multiplex Medgulf | 2016 | Firestopping (fire sealant) |
24 | State Audit Bureau Headquarters | SEG Qatar | 2014 | Firestopping (fire sealant) |
25 | Hamad Bin Khalifa Medical City CP300B Hospital Fit-Out | ANEL Group | 2014 | Firestopping (fire sealant) |
26 | Hamad Bin Khalifa Medical City CP300B Hospital Fit-Out | Hyundai Engineering & Contracting | 2013 | Firestopping (fire sealant) |
27 | Sidra Medical & Research Center | Qatar Technical Aluminum | 2014 | Firestopping (fire sealant) |
28 | NDIA CP-13 Utility Systems | Bemco Contracting Co. Qatar | 2011 | Firestopping (fire sealant) |
29 | NDIA CP-21 Catering Facility | PMB Facade Technology Sdn. Bhd. | 2011 | Firestopping (fire sealant) |
30 | NDIA CP-60 Central Utility Plant 2, 3 & 4 | C.A.T. International Qatar | 2011 | Firestopping (fire sealant) |
31 | NDIA CP-27 Midfield Area Access System | Consolidate Contractors International and Teyseer Contracting Co. JV | 2011 | Firestopping (fire sealant) |
32 | Design & Construction of Doha City Club – The NED (Renovation of former ministry of interior building in Corniche area) | Urbacon Trading & Contracting Company (UCC) | 2022 | Fire proofing of Steel structure (Cementitious and Intumescent) |
33 | Hamad International Airport Expansion- Western Taxiway and stand development works | UCC-Bahadir and Tedeschia JV (UBT JV) | 2022 | Fire proofing of Steel structure (Cementitious) |
34 | The View Hospital | Urbacon Trading & Contracting Company (UCC) | 2021 | Fire proofing of Steel structure (Intumescent) |
35 | Qatar PPP Development Package1 (8 Schools) | Al Jaber Trading Contracting | 2011 | Fire proofing of Steel structure (Intumescent) |
36 | 5-star Resort in Qetaifan Island | Al Jaber Trading Contracting | 2020 | Fire proofing of Steel structure (Cementitious and Intumescent) |
37 | Bin Al Sheikh Towers | Al Jaber Trading Contracting | 2021 | Fire proofing of Steel structure (Cementitious and Intumescent) |
38 | Marina Mixed 12 Towers | Al Alia Trading & Contracting | 2019 | Fire proofing of Steel structure (Intumescent) |
39 | Qatar Academy Expansion | Gulf Steel engineering | 2018 | Fire proofing of Steel structure (Cementitious and Intumescent) |
40 | Doha Oasis Mall and Mixed-use development | Redco Constructions- Almana | 2017 | Fire proofing of Steel structure (Intumescent) |
41 | Lusail Fox hills North Building A2 | Qatari Development Company for Trading & Contracting | 2018 | Epoxy Floor Coating |
42 | HILTON Al Rufa Hotel | Al Darwish Trading & Contracting | 2020 | Epoxy Floor Coating |
43 | Kempenski Marsa Malaz-Pearl Qatar | AlFardan Properties | 2019 | Epoxy Floor Coating |
44 | Al Alfia School at Umm Garn | Harinsa Qatar | 2020 | Epoxy Floor Coating |
45 | Design and Built 27 Schools Package 1& Package 2 | Amana Qatar Contracting | 2020 | Epoxy Floor Coating |
46 | Mall of Qatar | Golden bay Contracting | 2022 | Epoxy Floor Coating |
47 | Marina 33 tower at Lusail | Sigma Contracting and Trading | 2022 | Epoxy Floor Coating |
48 | Residential Buildings at Yasmeen City | Sigma Contracting and Trading | 2022 | Epoxy Floor Coating |
49 | Kempinski Residences and suites, Doha | Al Fardan Properties | 2020 | Concrete crack injection |
50 | Musheireb Downtown | HBK Contracting Co WLL | 2020 | Concrete crack injection |
51 | Doha Industrial area offsite works | Al Alia Trading & Contracting | 2020 | Concrete crack injection |
52 | Hamad International Airport Expansion- Western Taxiway and stand development works | UCC-Bahadir and Tedeschia JV (UBT JV) | 2022 | Fire-protection board lining for Tunnels |